
|
THE 456th FIGHTER INTERCEPTOR SQUADRON |
|
THE PROTECTORS OF S. A. C. |
|
|
|
|
The Pegasus Rocket |
Pegasus Firsts
- World's first privately developed space launch vehicle
- Maiden 1990 mission marked the first all-new, unmanned space launch vehicle developed in the U.S. in more than 20 years
- First winged vehicle to accelerate to eight times the speed of sound
- First air-launched rocket to place satellites into orbit, using its carrier aircraft as an "air breathing reusable first stage"
Pegasus rockets are the winged space booster vehicles used in an expendable launch system developed by Orbital Sciences Corporation (Orbital). Three main stages burning solid propellant provide most of the thrust.The Pegasus is carried aloft below a carrier aircraft and launched at approximately 40,000 ft (12,000 m). The carrier aircraft provides flexibility to launch the rocket from anywhere rather than just a fixed pad. A high-altitude launch also allows the rocket to avoid flight in the densest part of the atmosphere where more rocket fuel, and thus a larger launch vehicle, would be needed to overcome air friction.
It flies as a rocket-powered aircraft before leaving the atmosphere. It is capable of placing small payloads into low-Earth orbits.
The Pegasus Program
Click on Picture to enlarge
Pegasus launched from a B-52 Pegasus engine fires following release from a B-52 Stratofortress, 1991
The Pegasus's three Orion solid motors were developed by Hercules Aerospace (now Alliant Techsystems) specifically for the Pegasus launcher. Additionally, wing and tail assemblies and a payload fairing were developed. Most of the Pegasus was designed by a design team led by Dr. Antonio Elias. The wing was designed by Burt Rutan.
- Mass: 18,500 kg (Pegasus), 23,130 kg (Pegasus XL)
- Length: 16.9 m (Pegasus), 17.6 m (Pegasus XL)
- Diameter: 1.27 m
- Wing span: 6.7 m
- Payload: 443 kg (1.18 m diameter, 2.13 m length)
Orbital's internal projects, the Orbcomm communications constellation and the OrbView observation satellites, plus Orbcomm-derived satellites (the "Microstar" platform) served as guaranteed customers and additional seed money. Soon after development began, several government and military orders were placed, as the Scout launcher was slated for phaseout.
The first successful Pegasus launch occurred on April 5, 1990 with NASA test pilot and former astronaut Gordon Fullerton in command of the carrier aircraft. Initially, a NASA-owned B-52 Stratofortress NB-008 served as the carrier aircraft. By 1994, Orbital had transitioned to their "Stargazer" L-1011, a converted airliner which was formerly owned by Air Canada. The name "Stargazer" is an inside joke—in Star Trek: The Next Generation, Captain Picard was captain of a ship named Stargazer (his previous command to the Enterprise-D, and first officer Riker served aboard a ship named Pegasus (his first assignment), prior to their reporting to the Enterprise-D in the pilot episode. (An interesting point, undoubtedly not part of the in-joke, is that both fictional ships were lost while those officers, respectively, served on them.)
The Pegasus XL, introduced in 1994 has lengthened stages to increase payload performance. In the Pegasus XL, the first and second stages are lengthened into the Orion 50SXL and Orion 50XL, respectively. Higher stages are unchanged; flight operations are similar. The wing is strengthened slightly to handle the higher weight. The standard Pegasus has been discontinued; the Pegasus XL is still being produced. Pegasus has flown 38 missions in both configurations as of April 25, 2006. Of these, 35 were considered successful launches.
Dual payloads can be launched, with a canister that encloses the lower spacecraft and mounts the upper spacecraft. The upper spacecraft deploys, the canister opens, then the lower spacecraft separates from the third-stage adapter. Since the fairing is unchanged for cost and aerodynamic reasons, each of the two payloads must be relatively compact.
For their work in developing the rocket, the Pegasus team led by Dr. Antonio Elias was awarded the 1991 National Medal of Technology by U.S. President George H. W. Bush.
The initial launch price offered was US $6 million, without options or a HAPS (Hydrazine Auxiliary Propulsion System) maneuvering stage. With the enlargement to Pegasus XL, prices increased. At the same time, many improvements were made in the wake of early launch failures, requiring more money. In addition, customers usually purchase additional services, such as extra testing, design and analysis, and launch-site support. A launch package is then approximately US$30 million in total. Some customers also have OSC provide mission hardware, up to a fully functional spacecraft such as a Microstar. Such packages can be much higher in cost.
By weight, Pegasus is one of the most expensive "launch-to-orbit" vehicles, however, for many small satellites it's desirable to be the primary payload and have the launch vehicle put your spacecraft into the orbit you need, as opposed to flying as a secondary payload to a compromise orbit. For example, Pegasus launches from equatorial launch sites can put spacecraft in orbits which avoid the South Atlantic Anomaly, a high radiation region over the South Atlantic ocean, which is extremely desirable for many scientific spacecraft.
The Launch Profile
Click on Picture to enlarge
In a Pegasus launch, the carrier aircraft takes off from a runway with support and checkout facilities. Such locations have included Kennedy Space Center / Cape Canaveral Air Force Station, Florida; Vandenberg Air Force Base and Dryden Flight Research Center, California; Wallops Flight Facility, Virginia; Kwajalein Range in the Pacific Ocean, and the Canary Islands in the Atlantic. Orbital offers launches from Alcantara, Brazil, but no known customers have performed any. The capabilities of Alcantara are superfluous to other sites, without being any more convenient.
Upon reaching a predetermined staging time, location, and velocity vector, the aircraft releases the Pegasus. After five seconds of free-fall, the first stage ignites and the vehicle pitches up. The 45-degree delta wing (of carbon composite construction and double-wedge airfoil) aids pitch-up and provides some lift. The tail fins provide steering for first-stage flight, as the Orion 50S motor does not have a thrust-vectoring nozzle.
Approximately 1 minute and 17 seconds later, the Orion 50S motor burns out. The vehicle is at over 200,000 feet in altitude and hypersonic speed. The first stage falls away, taking the wing and tail surfaces, and the second stage ignites. The Orion 50 burns for approximately 1 minute and 18 seconds. Attitude control is by thrust vectoring the Orion 50 motor in two dimensions, pitch and yaw; roll control is provided by the nitrogen thrusters on the third stage.
Midway through second-stage flight, the launcher has reached a near-vacuum altitude. The fairing splits and falls away, uncovering the payload and third stage. Upon burnout of the second stage's motor, the stack coasts until reaching a suitable point in its trajectory, depending on mission. Then the Orion 50 is discarded, and the third stage's Orion 38 motor ignites. It too has a thrust-vectoring nozzle, assisted by the nitrogen thrusters for roll. After approximately 64 seconds, the third stage burns out.
A fourth stage is sometimes added for a higher altitude, finer altitude accuracy, or more complex maneuvers. The HAPS (Hydrazine Auxiliary Propulsion System) is powered by three restartable, monopropellant hydrazine thrusters. As with dual launches, the HAPS cuts into the fixed volume available for payload. In at least one instance, the spacecraft was built around the HAPS.
Guidance is via a 32-bit computer and an IMU. A GPS receiver gives additional information. Due to the air launch and wing lift, the first-stage flight algorithm is custom-designed. The second- and third-stage trajectories are ballistic, though, and their guidance is derived from a Space Shuttle algorithm.
The Carrier Aircraft
Click on Picture to enlarge
It may seem at first glance that the aircraft serves as a booster to increase payloads. In fact, air launch is largely used to reduce cost. 40,000 feet is only about 10% of the minimum altitude needed for a temporarily-stable orbit, and 4% of a generally-stable low earth orbit. The airliner is designed for approximately Mach 0.8; this is about 3% of orbital velocity.
The single biggest cause of traditional launch delays is weather. Carriage to 40,000 feet takes the booster above the troposphere, into the stratosphere. Conventional weather is limited to the troposphere, and crosswinds are much gentler at 40,000 feet. Thus the Pegasus is largely immune to weather-induced delays, and their associated costs, once at altitude. (Bad weather is still avoided during takeoff, ascent, and the transit to the staging point).
Air launching reduces range costs. No blastproof pad, blockhouse, or associated equipment is needed. This permits takeoff from a wide variety of sites, generally limited by the support and preparation requirements of the payload. The travel range of the aircraft allows launches at the equator, which increases performance and is a requirement for some mission orbits. Launching over oceans also reduces insurance costs, which are not small for a vehicle filled with what are essentially explosives.
Launch at altitude allows a larger, more efficient, yet cheaper first-stage nozzle. Its expansion ratio can be designed for low ambient air pressures, without risking flow separation and flight instability during low-altitude flight. The extra diameter of the high-altitude nozzle would be difficult to gimbal. But with reduced crosswinds, the fins can provide sufficient first-stage steering. This allows a fixed nozzle, which saves cost and weight versus a hot joint.
A single-impulse launch results in an elliptical orbit, with a high apogee and low perigee. The use of three stages, plus the coast period between second and third stage firings, help to circularize the orbit, ensuring the perigee clears the Earth's atmosphere. If the Pegasus launch had begun at low altitude, the coast period or thrust profile of the stages would have to be modified to prevent skimming of the atmosphere after one pass.
For launches which do not originate from Vandenberg Air Force Base, the carrier aircraft is also used to ferry the assembled launch vehicle to the launch site. For such missions, the payload can either be installed at the base and ferry with the launch vehicle or be installed at the launch site.
Related Projects
Click on Picture to enlarge
Pegasus components have also been the basis of other OSC launchers. The ground-launched Taurus rocket places the Pegasus stages and a larger fairing atop a Castor 120 first stage, derived from the first stage of the MX Peacekeeper missile. Initial launches used refurbished MX first stages.
The Minotaur I, also ground-launched, is a combination of stages from Taurus launchers and Minuteman missiles, hence the name. The first two stages are from a Minuteman II; the upper stages are Orion 50XL and 38. Due to the use of surplus military rocket motors, it is only used for US Government and government-sponsored payloads.
A third vehicle is dubbed Minotaur V despite containing no Minuteman stages. It consists of a refurbished MX with an Orion 38 added as a fourth stage.
The NASA X-43A hypersonic test vehicles were boosted by Pegasus first stages. The upper stages were replaced by exposed models of a scramjet-powered vehicle. The Orion stages boosted the X-43 to its ignition speed and altitude, and were discarded. After firing the scramjet and gathering flight data, the test vehicles also fell into the Pacific.
[edit] Launch history
Pegasus has flown 40 missions between 1990 and 2008.[1]
Date Payload Result 1990-04-05 19:10:17 UTC Pegsat, NavySat Success 1991-07-17 17:33:53 UTC Microsats (7 satellites) Partial success (orbit slightly low) 1993-02-09 14:30:00 UTC SCD-1 Success 1993-04-25 13:56:00 UTC ALEXIS – Array of Low Energy X-ray Imaging Sensors Success 1994-05-19 17:03:00 UTC STEP-2 (SIDEX) Partial success (orbit slightly low) 1994-06-27 21:15:00 UTC STEP-1 Failure (destroyed approx. 3 minutes after launch) 1994-08-03 14:38:00 UTC APEX Success 1995-04-03 13:48:00 UTC Orbcomm (2 satellites), OrbView-1 Success 1995-06-22 19:58:00 UTC STEP-3 Failure (destroyed between first- and second-stage flight) 1996-03-09 01:53:00 UTC REX II Success 1996-05-17 02:44:00 UTC MSTI-3 Success 1996-07-02 07:48:00 UTC TOMS – Total Ozone Mapping Spectrometer Success 1996-08-21 09:47:00 UTC FAST (Fast Auroral Snapshot Explorer) Success 1996-11-04 17:08:00 UTC HETE, SAC-B Failure (Satellites not ejected from third stage) 1997-04-21 11:59:00 UTC MiniSat, Celestis space burial Success 1997-08-01 20:20:00 UTC OrbView-2 Success 1997-08-29 15:02:00 UTC FORTE Success 1997-10-22 13:13:00 UTC STEP-4 Success 1997-12-23 19:11:00 UTC Orbcomm (8 satellites) Success 1998-02-26 07:07:00 UTC SNOE, BATSAT Success 1998-04-02 02:42:00 UTC TRACE Success 1998-08-02 16:24:00 UTC Orbcomm (8 satellites) Success 1998-09-23 05:06:00 UTC Orbcomm (8 satellites) Success 1998-10-22 00:02:00 UTC SCD-2 Success 1998-12-06 00:57:00 UTC SWAS Success 1999-03-05 02:56:00 UTC WIRE – Wide Field Infrared Explorer Success 1999-05-18 05:09:00 UTC Terriers, MUBLCOM Success 1999-12-04 18:53:00 UTC Orbcomm (7 satellites) Success 2000-06-07 13:19:00 UTC TSX-5 Success 2000-10-09 05:38:00 UTC HETE 2 Success 2002-03-05 20:58:00 UTC RHESSI Success 2003-01-25 20:13:00 UTC SORCE Success 2003-04-28 12:00:00 UTC GALEX – Galaxy Evolution Explorer Success 2003-06-26 18:55:00 UTC OrbView-3 Success 2003-08-13 02:09:00 UTC SCISAT-1 Success 2005-04-15 17:27:00 UTC DART Success 2006-03-28 20:10:00 UTC ST-5 – Space Technology 5 (3 satellites) Success 2007-04-25 20:26:00 UTC AIM – Aeronomy of Ice in the Mesosphere Success 2008-04-16 17:01:00 UTC C/NOFS Success 2008-10-19 17:47:23 UTC IBEX – Interstellar Boundary Explorer Success 2011-00-00 00:00:00 UTC NuSTAR – Nuclear Spectroscopic Telescope Array Queued [2]
Wikipedia,
USE YOUR BROWSER "BACK" BUTTON TO RETURN TO PERVIOUS PAGE
|
Last Updated |
|
06/22/2009 |
|
Powered By |
|
456FIS.ORG |
